Case studies

 

Converter transformer load losses

GSU transformer upgrade - Tank hot spot

Forces under double inrush condition

Top lead exit thermal analysis

LV losses

Tank temperature rise verification

Verification of the real need of surge arresters

Switching overvoltages in windfarms

Dielectric measurement in a wind farm

Harmonic Load Flow

Very-fast-front overvoltages

Dielectric field analysis on transformer windings

Windfarm onsite measurement