Summary

Description

Technical Challenge

Results

Conclusions

Download

Back to Case Studies

 
Dielectric measurement in a wind farm - Technical Challenge

• Correct set of electrical quantities to be monitoring.

• Due to the low GSM signal, had to install an amplifier antenna for remote reading.

• Select a representative tower of the electrical phenomena.

 Results