Summary

Description

Technical Challenge

Results

Conclusions

Download

Back to Case Studies

 

Tank temperature rise verification  - Conclusions

Good match between simulations and measurements. Simulations may be used to predict and prevent failures. In this way alternative solution can be studied at a design stage if the results of the simulations are not the ones expected.

Back to Case Studies

Courtesy of: ABB Industrial Transformers, Legnano, Italy