GSU Transformer Upgrade – Tank Hot Spot - Technical Challange
-
Aluminium shields inside the tank, mild steel
tank wall and non magnetic steel cover parts had to be taken into
account
-
A 3-dimensional modelling was necessary
-
Close cooperation with the manufacturer of the
enclosure and quick delivery of the simulations were a must in
order to identify a solution in time for the scheduled maintenance
of the power plant