GSU Transformer Upgrade – Tank Hot Spot - Technical Challange

  • Aluminium shields inside the tank, mild steel tank wall and non magnetic steel cover parts had to be taken into account
  • A 3-dimensional modelling was necessary
  • Close cooperation with the manufacturer of the enclosure and quick delivery of the simulations were a must in order to identify a solution in time for the scheduled maintenance of the power plant

Results