Summary

Description

Technical Challenge

Results

Conclusions

Download

Back to Case Studies

 

Very-fast-front overvoltages - Description

Disconnector switching operation in a GIS may produce fast transient overvoltages due to the voltage collapse across the poles at striking. The overvoltage shape is formed by the multiple reflections and refractions of the steps at all points where impedance changes are encountered.

Technical Challenge