Harmonic Load Flow - Summary

The project of a new steel plant, which should be installed directly to the transmission grid, comprises a 170MVA filter system. The transmission company requested a detailed study of electromagnetic compatibility and in particular about the harmonic load flow.

The result of the study shows that some individual voltage harmonics exceeded the emission limits. Simulations could improve the filtering system before the commissioning of the steel plant!

Description