|
Summary
Description
Technical Challenge
Results
Conclusions
Download
Back to Case
Studies
|
|
|
|
Converter Transformer Load Losses - Conclusions
Simulation allow OEMs to identify critical spots in the windings, to
understand the nature of the problem and to validate corrective
actions, for example chenge of:
- type and number of conductors
- number, shape and relative position of elementary windings
making up the LV windings (to improve current sharing).
Back
to Case Studies |
|
|